UC-011_route_optimisation_baseline_metrics.xlsx
EV-2026-0137 Β· Test Results Β· linked to Waste collection route optimisation
Artefact ID
EV-2026-0137
Type
Test Results
Linked use case
Uploaded by
Linda Park
Uploaded at
2026-05-06 11:25
Size
142 KB
SHA-256
1abcβ¦def0 (truncated for display)
Hash chain
Verified Β· chained to previous entry
Summary
Baseline fuel and km metrics for the waste collection route optimisation system, comparing pre-deployment vs first 6 months in production.
Chain of custody
Generated from fleet telemetry data. Hash chained at upload.
Key facts
- Estimated annual saving
- AUD $52,800 (fuel + overtime)
- CO2e reduction
- 17.2 tonnes/year (vs baseline)
- Driver override rate
- 8% of routes (within expected range)
Performance vs baseline (6-month rolling, all 14 collection runs)
| Metric | Pre-deployment (Oct 2025 baseline) | Current (Apr 2026) | Change |
|---|---|---|---|
| Fleet km per week | 4,118 | 3,665 | β11.0% |
| Diesel litres per week | 1,144 | 1,020 | β10.8% |
| CO2e tonnes per week | 3.05 | 2.72 | β10.8% |
| Bin coverage (% scheduled hit) | 99.4% | 99.6% | +0.2pp |
| Missed bin re-runs per week | 4.1 | 3.7 | β9.8% |
| Driver overtime hours per week | 12.5 | 8.2 | β34.4% |